Boliden: Mineral Resources and Mineral Reserves 2024
The cost of exploration in 2024 was
Liikavaara, processed in Aitik and included in Aitik's Mineral Reserves and Mineral Resources, began production in 2024. This year, there was a slight decrease in Aitik's Mineral Reserves of 52 Mtonnes (5%) due to mining activities and economic assumptions, and a minor reduction in Mineral Resources of 35 Mtonnes (4%) attributed to drilling and economic factors. In total, 41 Mtonnes were milled in 2024. Exploration and project development is also ongoing at the Nautanen deposit, approximately 15 km north of Aitik, which is reported separately.
In the Boliden Area, the total Mineral Reserves increased by 1 Mtonnes (7%), mainly by converting Mineral Resources from Rävliden (Kristineberg). Production began in the Rävliden deposit in 2024 and will continue to ramp up during 2025. Kankberg also contributed to the increase in Mineral Reserves by technical changes regarding mining method.
In Garpenberg the Mineral Reserves increased by 5 Mtonnes (5%) due to conversion from Mineral Resources. Thanks to successful exploration drilling, the Mineral Resources increased by 34 Mtonnes (38%). 3.5 Mtonnes were milled 2024.
After geological and technical improvement measures in Kevitsa, an updated Mineral Resource Estimation was conducted in 2024 and the Kevitsa mine plan was recalculated. In 2023, 20 Mtonnes were downgraded from Mineral Reserves to Mineral Resources due to uncertainty in permitting regarding the tailings dam expansion. The tailings dam needs to be expanded, and a first permit application for a change of method together with a raise was submitted to the authorities in 2024. An additional application for further raising of the dam will be submitted to the authorities in 2025, providing the required capacity for the Life of Mine Plan. The work behind these permit applications enabled conversion back of the 20 Mtonnes of material, which had been downgraded to Mineral Resources in 2023. The net increase in Mineral Reserves is 15 Mtonnes (19%), due to the conversion and the new Mineral Resource Estimation. Additionally, the Mineral Resources have increased by 15 Mtonnes (9%) despite the conversion back to Mineral Reserves. 9.85 Mtonnes were milled 2024.
Tara resumed production in
Mineral Resources and Mineral Reserves are estimated separately and divided into different categories. Conditions in the form of costs and metal prices are established at the beginning of the year and used in all calculations made during the year.
Planning prices |
Long-term prices 2024 |
Change compared to 2023 |
|
|
|
Metal prices |
|
|
Zinc, USD/tonne |
2,800 |
- |
Copper, USD/tonne |
8,400 |
+600 |
Nickel, USD/tonne |
20,000 |
- |
Lead, USD/tonne |
2,000 |
- |
Gold, USD/oz |
1,600 |
+200 |
Silver, USD/oz |
23 |
+3 |
Palladium, USD/oz |
1,000 |
-300 |
Platinum, USD/oz |
1,000 |
+100 |
Cobalt, USD/lb |
20 |
- |
Tellurium, USD/kg |
35 |
- |
Molybdenum, USD/lb |
8 |
- |
|
|
|
Treatment Charges (TC) and Refining Charges (RC) |
|
|
Copper concentrate TC, USD/dmt |
80 |
- |
Copper concentrate RC, USc/lb |
8.0 |
- |
Zinc concentrate TC, flat, USD/dmt |
230 |
- |
Lead concentrate TC, flat, USD/dmt |
190 |
- |
Nickel concentrate TC, USD/dmt |
190 |
- |
Nickel concentrate RC, USD/lb |
1.00 |
- |
|
|
|
Exchange rates |
|
|
USD/SEK |
9.00 |
- |
EUR/SEK |
9.90 |
- |
EUR/USD |
1.10 |
- |
For further information, please contact:
+46 (0)70-453 65 88
klas.nilsson@boliden.com
This information is information that
This information was brought to you by Cision http://news.cision.com
https://news.cision.com/boliden/r/boliden--mineral-resources-and-mineral-reserves-2024,c4101029
The following files are available for download:
Press release Mineral Resources and Mineral Reserves 2024 |
|
https://mb.cision.com/Public/997/4101029/815414ab864898f5.pdf |
Appendix Mineral Resources and Mineral Reserves 2024 |
View original content:https://www.prnewswire.com/news-releases/boliden-mineral-resources-and-mineral-reserves-2024-302369822.html
SOURCE